upgrade to 3.0
This commit is contained in:
19
content/blog/2009-05-11-back-to-work-2.md
Normal file
19
content/blog/2009-05-11-back-to-work-2.md
Normal file
@@ -0,0 +1,19 @@
|
||||
---
|
||||
title: 'Back to Work'
|
||||
date: '2009-05-11T07:01:18-04:00'
|
||||
permalink: /back-to-work-2/
|
||||
tags:
|
||||
- 'planned obsolescence'
|
||||
- writing
|
||||
---
|
||||
|
||||
I began the summer’s work yesterday morning by starting a read-through of the manuscript thus far, and was thrilled to discover that the introduction is not as far off as I thought it was. It needs a bit of tinkering, but a small enough bit that I’m comfortable putting it in the category of “revision.” So here’s what I think needs to be done between now and August 14:
|
||||
|
||||
— finish last section of Chapter 5 (on the university)
|
||||
— research and write Chapter 4 (on the library)
|
||||
— figure out how to turn CommentPress article into Chapter 3 (on networked publishing structures)
|
||||
— possibly write a conclusion
|
||||
— revise!
|
||||
|
||||
It’s not as bad as I feared, but it still makes me want to hyperventilate.
|
||||
|
||||
Reference in New Issue
Block a user